Wild V2 Development
Date
2025
Location
London, UK
Services
Engineering
Testing
DFM
The Brief
Overview
Engineering development and design for manufacture (DFM) of the Wild deodorant case, with a focus on product reliability, manufacturing quality and functional performance. The work involved hands-on testing, identifying technical issues and implementing design improvements to support consistent production.
The Challenge
The challenge was to reduce residual formula waste within a tight development timeframe, working around existing components and fixed injection mould tooling. With limited scope to modify the wider assembly, the focus shifted to rapidly redesigning the internal build plate. Through targeted CAD iterations, prototyping and functional testing, a practical solution was developed to minimise wasted formula while maintaining compatibility with the existing design and manufacturing constraints.
Solution
The build plate was redesigned through rapid CAD iteration, prototyping and functional testing. The revised geometry focused on reducing residual formula while maintaining compatibility with existing components and tooling. This targeted engineering approach minimised manufacturing disruption and provided a practical, cost-effective solution within the project's time constraints.

Prototyping & Iteration
Working closely with Far East manufacturing partners, the project involved coordinating prototype development, reviewing production samples and identifying issues through physical testing. Regular feedback with suppliers helped translate test findings into practical design modifications, refining component tolerances, manufacturing quality and product performance through successive iterations.



Real-World Testing
Feedback from real-world product use highlighted opportunities to improve performance and reduce product waste. One key development focused on redesigning an internal component known as the build plate to minimise residual deodorant left within the case. Through iterative CAD development, prototyping and functional testing, the component was refined to improve product efficiency while maintaining compatibility with the existing assembly and manufacturing processes.

Results
Design Validation
The challenge was to reduce residual formula waste within a tight development timeframe, working around existing components and fixed injection mould tooling. With limited scope to modify the wider assembly, the focus shifted to rapidly redesigning the internal build plate. Through targeted CAD iterations, prototyping and functional testing, a practical solution was developed to minimise wasted formula while maintaining compatibility with the existing design and manufacturing constraints.
Final Design
The build plate was redesigned through rapid CAD iteration, prototyping and functional testing. The revised geometry focused on reducing residual formula while maintaining compatibility with existing components and tooling. This targeted engineering approach minimised manufacturing disruption and provided a practical, cost-effective solution within the project's time constraints.